VESC/ Fungineers BMS Setup Guide

Please setup your BMS as per the video below: 

 

Please download the latest VESC Tool Beta for this via the official VESC website, in case you cant, this is the latest BETA VESC Tool version as of Feb 2025 (future versions may have features not available in this):

VESC TOOL BETA (Feb 2025)

Overall BMS Pinout

 

Battery configurations:

Please refer to the below wiring order as per your battery configuration: 

32S Wiring

 

 

20S Wiring (The red wire going from 20S to 32S can be ignored)

 

For other configurations, please reach out to us.

Be safe!
Keep Fungineering.