VESC/ Fungineers BMS Setup Guide

VESC BMS Setup:

Initial setup for standalone BMS (you dont need to setup anything if you received the BMS with our complete battery pack).

Please setup your BMS as per the video below: 

 

Please download the latest VESC Tool Beta for this via the official VESC website, in case you cant, this is the latest BETA VESC Tool version as of Feb 2025 (future versions may have features not available in this):

VESC TOOL BETA

Final steps:

Once the setup is done, please disable 'Block sleep' and Write the settings, and youre done! Enjoy your Vesc BMS!

 

 

Overall BMS Pinout

 

Battery configurations:

Please refer to the below wiring order as per your battery configuration: 

32S Wiring

 

 

20S Wiring (The red wire going from 20S to 32S can be ignored)

 

18S Wiring; needs a Jumper (The red wire going from 18S to 32S can be ignored)

 

For other configurations, please reach out to us.

Be safe!
Keep Fungineering.